Skip to main content
. 1985 Jul-Aug;90(4):305–317. doi: 10.6028/jres.090.019

Table 5.

Productivity measurement techniques.

Questionnaire/Survey Empirical Analysis
- Before and after 1 measurement - Before and after measurement
- Assessment of need - Intuitive
- Quantitative metrics - Quantitative metrics
- Qualitative measures - Qualitative measures
- Methodology/formula
1

The establishment of a baseline level of productivity prior to the introduction of the new technology is essential to the success of a “before and after” assessment.