Table 5.
Productivity measurement techniques.
| Questionnaire/Survey | Empirical Analysis |
|---|---|
| - Before and after 1 measurement | - Before and after measurement |
| - Assessment of need | - Intuitive |
| - Quantitative metrics | - Quantitative metrics |
| - Qualitative measures | - Qualitative measures |
| - Methodology/formula |
The establishment of a baseline level of productivity prior to the introduction of the new technology is essential to the success of a “before and after” assessment.