FIGURE 7.
Angle analysis over the bilateral occipital channels in the P2p latency range. Angle between the parameter estimate vector and all the candidate dimensions (A) for channel PO7i at 231 ms, (B) for channel PO8i at 213 ms. Values inside square brackets represent the Euclidean norm of the parameter estimate vector. The size of each polar plot is scaled according the norm of the parameter estimate vector.