Table 7.
Secondary rate of water absorption for admixed concrete (x 10−6 m/s0.5).
mix | days of curing |
|||||
---|---|---|---|---|---|---|
3 | 7 | 28 | 60 | 90 | 365 | |
R0 | 1.21 | 1.15 | 0.91 | 0.76 | 0.62 | 0.59 |
M1 | 0.99 | 0.94 | 0.88 | 0.75 | 0.56 | 0.44 |
M2 | 0.60 | 0.55 | 0.53 | 0.51 | 0.47 | 0.43 |
R2 | 0.57 | 0.52 | 0.50 | 0.49 | 0.43 | 0.39 |
M3 | 0.51 | 0.50 | 0.47 | 0.43 | 0.43 | 0.37 |
R1M2 | 0.50 | 0.49 | 0.45 | 0.41 | 0.40 | 0.34 |
R1M3 | 1.21 | 1.15 | 0.91 | 0.76 | 0.62 | 0.59 |
M4 | 0.99 | 0.94 | 0.88 | 0.75 | 0.56 | 0.44 |
R2M2 | 0.60 | 0.55 | 0.53 | 0.51 | 0.47 | 0.43 |
R2M3 | 0.57 | 0.52 | 0.50 | 0.49 | 0.43 | 0.39 |