Skip to main content
. 2018 Apr 30;84(1):190–197. doi: 10.29024/aogh.21

Table 2.

ICT Infrastructure Installed (May 2016 to May 2017).

Hardware Software

Dell PowerEdge Server, uninterruptable power supply (UPS) and switch. Microsoft Office 365 licenses for 450 students and lecturers.
Five data projectors (one for each lecture room and one spare) with five spare bulbs. Special interface in SharePoint to simulate a LMS.
55-inch monitor screen mounted on the wall of Lecturer’s Laboratory. SharePoint configured with COHLS course outline structure and populated with existing as well as new e-learning content.
Jabra omnidirectional microphone and Logitech webcam. CmapTools [15] (Concept map).
Lecture hall loudspeaker system consisting of two remote handheld microphones, internal battery supply, Bluetooth connections and internet connectivity.