Table 2.
ICT Infrastructure Installed (May 2016 to May 2017).
Hardware | Software |
---|---|
Dell PowerEdge Server, uninterruptable power supply (UPS) and switch. | Microsoft Office 365 licenses for 450 students and lecturers. |
Five data projectors (one for each lecture room and one spare) with five spare bulbs. | Special interface in SharePoint to simulate a LMS. |
55-inch monitor screen mounted on the wall of Lecturer’s Laboratory. | SharePoint configured with COHLS course outline structure and populated with existing as well as new e-learning content. |
Jabra omnidirectional microphone and Logitech webcam. | CmapTools [15] (Concept map). |
Lecture hall loudspeaker system consisting of two remote handheld microphones, internal battery supply, Bluetooth connections and internet connectivity. |