FIGURE 4.
Four possible methods of iteration in the calculation of the biweight and associated scale from a sample of n observations.
For purposes of notational clarity, the following notation is used:
T = biweight location estimate
s = MAD scale estimate (equation 7)
s* = biweight scale estimate (equation 8)
and the subscript on each refers to the iteration at which the estimate is calculated.