Table 1.

Number of production tests monitored by acoustic emission [5]. (Total up to 7.1.79; numbers in brackets 7.1.78-7.1.79 only.)

Shop hydrotest Pre-service (installed) In-service (requalification) On-line monitoring*
Chemical/petroleum vessels 32 [5] 4 [0] 382 [88] 12 [4]
Chemical/petroleum systems - 3 [0] 50 [0] 3 [2]
Chemical/petroleum components and piping 1548 [812] 34 [28] 57 [25] 14 [8]
Nuclear reactor vessels 24 [1] 4 [0] 5 [2] 4 [0]
Nuclear power plant systems - 22 [0] 9 [0] -
Nuclear components and piping 8 [0] 22 [1] 1037 [26] 99 [64]
Nonnuclear power plant components 2 [0] - 5 [2] 17 [16]
FRP vessels 595 [135] 47 [14] 75 [70] 12 [12]
FRP components and piping 23 [23] 303 [300] 12 [12] -
Storage tanks 46 [1] 29 [6] 68 [14] 1 [0]
Cell liners - - 12 [0] 4 [0]
Rocket cases (missiles, etc.) 208 [2] - - -
Autoclaves 2 [0] 1 [0] 33 [18] 11 [3]
Misc. pressure vessels 17 [11] 2 [0] 107 [30] -
Misc. components 2860 [360] 4 [3] 240 [240] 230 [34]
Structures (bridges, cranes, etc.) - 14 [12] 85 [14] 4 [1]
Heat exchanger tubing (ft) 231,000 - 500 [500] -
Liquid and gas pipelines (ft) 58 [5] 1000 [0] 517,000 [46,000] 2002 [2000]
Drill pipe (ft) 961,000 [961,000]
*

On-line surveillance of operating systems or components.

Excludes experimental vessels.

Tested separately from a system test.