Skip to main content
. 2019 Aug 14;13(2):90–97. doi: 10.15171/joddd.2019.014

Table 3. The maximum stress bearing amount and location on the whole implant-bridge system and on the FPD using Von-Mises criteria.

Force type (refer to Table 2) Maximum stress on the whole system Maximum stress in the bridge part
Order Location Amount (MPa) Location Amount (MPa)
1 Screws' body 286.0 The upper part of pontic between 13 and 14 27.9
2 Screws' body 297.1 The upper part of pontic between 13 and 14 81.9
3 The upper part of pontic between 13 and 14 286.2 The upper part of pontic between 13 and 14 286.2
4 The upper part of pontic between 13 and 14 369.6 The upper part of pontic between 13 and 14 369.6
5 The upper part of pontic between 13 and 14 546.0 The upper part of pontic between 13 and 14 546.0