Skip to main content
. 2019 Sep 25;8:e46574. doi: 10.7554/eLife.46574

Author response image 1. Evaluation of hexamer i, assembled for dimer B.

Author response image 1.

Back-calculated PRE rates (black lines) are shown in panels A-D. Top (E) and side (F) view of the structural model.