Skip to main content
. 2019 Aug 30;8(9):316. doi: 10.3390/plants8090316

Figure A2.

Figure A2

Sketch for the composting facility: (a) Composting facility—4 modules; (b) tank for the collection and recirculation of the water excess, built underground; (c) compressor for the air flow; (d) tank for composting, internal view; (e) compost components pre-soaking [68]. Source: Photo original—SC CIUPERCĂRIA SRL, Aghireșu-Fabrici, Cluj County.