Skip to main content
. 2019 Oct 10;6:198. doi: 10.1038/s41597-019-0196-1

Fig. 2.

Fig. 2

An example of the AGB estimation with the BIOMASS R-package. MDJ-02, CAP-10 and other indexes on the horizontal axis are Plot IDs. The vertical axis is AGB in Mg ha−1 and the error bar represents the credibility interval at 95% of the stand AGB value following error propagation.