Skip to main content
. 2019 Sep 25;16(19):3585. doi: 10.3390/ijerph16193585

Table 3.

Inputs of developers of environmental start-up projects on the criteria of evaluation.

Name Criteria X1 X2 X3 X4 X5
L d L d L d L d L d
DK11 L 0.6 L 0.9 A 0.8 H 0.9 H 0.7
DK12 BA 0.7 BA 0.8 A 0.6 A 0.8 H 0.9
DK21 L 0.8 BA 0.7 A 0.4 H 0.7 H 0.7
DK22 BA 0.8 A 0.9 BA 0.8 H 0.7 A 0.8
DK23 BA 0.6 A 0.8 BA 0.6 H 0.9 A 0.6
DK24 BA 0.6 BA 0.9 A 0.8 A 0.8 A 0.5
DK25 A 0.8 A 0.7 BA 0.8 A 0.7 A 0.7
DK31 A 0.9 H 0.8 BA 0.8 BA 0.9 BA 0.8
DK32 L 0.8 H 0.6 L 0.8 H 0.9 H 0.9
DK33 L 0.7 H 0.6 H 0.6 H 0.6 H 0.9
DK34 BA 0.6 A 0.8 BA 0.8 BA 0.8 A 0.8