Table 1.
Conflicts between PKN (the Polish Committee for Standardization) standards and PKP PLK S.A. (the Polish national railway) regulations in terms of load tests, based on [16].
![]() |
![]() |
![]() |
![]() |
![]() |
---|---|---|---|---|
PN-89/S-10050 | PN-99/S-10040 | Id-16 Instructions (2005) | Id-16 Instructions (2014) | PKP Standards (2009) |
Static Load Test | ||||
L * > 21 m | Every bridge | Every bridge | Not applicable | Every bridge |
Dynamic Load Test | ||||
L > 21 m | L = approx. 15 m | Steel: L > 21 m Concrete: L > 10 m |
Not applicable | L > 21 m |
* L—the length of the bridge.