Table 2.
Agent | Job title | N | AM | Median | SD | GM | GSD | Min | Max |
---|---|---|---|---|---|---|---|---|---|
Quartz | Sand preparation | 4 | 0.026 | 0.026 | 0.018 | 0.02 | 2.4 | 0.0064 | 0.046 |
Melting | 13 | 0.029 | 0.013 | 0.05 | 0.013 | 3.5 | 0.0014 | 0.19 | |
Core making | 5 | 0.09 | 0.028 | 0.14 | 0.017 | 12 | 0.0013 | 0.33 | |
Moulding | 14 | 0.025 | 0.023 | 0.021 | 0.016 | 3.1 | 0.0014 | 0.077 | |
Casting | 4 | 0.0066 | 0.0056 | 0.004 | 0.0057 | 1.8 | 0.0029 | 0.012 | |
Shake out | 5 | 0.12 | 0.08 | 0.11 | 0.08 | 2.8 | 0.023 | 0.29 | |
Fettling and blasting | 18 | 0.12 | 0.03 | 0.21 | 0.024 | 7.6 | 0.0014 | 0.61 | |
Inspection | 4 | 0.029 | 0.031 | 0.024 | 0.016 | 4.6 | 0.0019 | 0.05 | |
Maintenance incl. cleaning | 4 | 0.022 | 0.024 | 0.012 | 0.019 | 2.2 | 0.0059 | 0.035 | |
Transport | 7 | 0.016 | 0.017 | 0.0086 | 0.013 | 2 | 0.0039 | 0.029 | |
Others | 7 | 0.0066 | 0.0058 | 0.0042 | 0.0053 | 2.1 | 0.0015 | 0.014 | |
Total | 85 | 0.052 | 0.018 | 0.11 | 0.016 | 4.4 | 0.0013 | 0.61 |
N number of measurements, AM arithmetic mean, SD standard deviation, GM geometric mean, GSD geometric standard deviation