Skip to main content
. 2019 Oct 23;5(10):e02698. doi: 10.1016/j.heliyon.2019.e02698

Fig. 9.

Fig. 9

Variation of a) energy contribution and b) days of operation with respect to tow size for fixed precursor package size.