Skip to main content
. 2019 Nov 5;22(11):e25409. doi: 10.1002/jia2.25409

Table 2.

ART initiation within 30 days for those eligible for Fast‐Track Treatment Initiation Counselling in the enrolled cohort

Intervention Control
Facility N Initiated within 30 days % Initiated Facility N Initiated within 30 days % Initiated
GP Site 1 28 21 75.0 GP Site 4 29 22 75.9
GP Site 2 29 22 75.9 GP Site 5 30 24 80.0
GP Site 3 28 28 100.0 GP Site 6 30 19 63.3
LP Site 1 30 25 83.3 LP Site 4 35 27 77.1
LP Site 2 29 25 86.2 LP Site 5 29 26 89.7
LP Site 3 26 16 61.5 LP Site 6 30 22 73.3
NW Site 1 32 27 84.4 NW Site 4 30 25 83.3
NW Site 2 31 28 90.3 NW Site 5 30 26 86.7
NW Site 3 30 26 86.7 NW Site 6 29 26 89.7
KZN Site 1 33 28 84.8 KZN Site 4 34 31 91.2
KZN Site 2 34 29 85.3 KZN Site 5 32 27 84.4
KZN Site 3 30 23 76.7 KZN Site 6 30 28 93.3
Totala 360 298 82.8 Total 368 303 82.3
Risk difference       0.5% (−5.1% to 6.0%)
Total (pre‐period) 5293 4719 89.2 Total (pre‐period) 4956 4611 93.0
Risk difference (pre‐period) −3.9% (−5.0 to −2.8%)
Difference in differences 4.4% (0.03% to 8.8%)
Difference in differences (covariate adjusted) 6.3% (3.0% to 10.0%)
Difference in differences (covariate adjusted and cluster adjusted) 6.3% (−0.6% to 13.3%)

GP, Gauteng Province; LP, Limpopo Province; NW, North West Province; KZN, KwaZulu Natal Province.

a

2 subjects (0.2% of total sample size) do not have outcomes as they were not found in the TIER.Net dataset and the files were not able to be located during follow‐up data collection. Note that this is a crude analysis, without adjustment for clustering or covariates as is done below for the final model. All analyses are crude within the report unless otherwise specified

analyses are adjusted for clustering by site using a generalized estimating equation with site level clustering and an unstructured correlation matrix.