Table 7.

Positive and negative rates results of the 10 folds cross validation.

Normal Flooding Scheduling Grayhole Blackhole
TPR 0.999 0.982 0.929 0.989 0.995
TNR 0.982 1 1 1 1
FPR 0.018 0 0 0.1 0
FNR 0.001 0.018 0.071 0.011 0.005
Overall Accuracy 0.997

TPR: true positive rate, TNR: true negative rate, FPR: false positive rate, and FNR: false positive rate.