Skip to main content
. 2019 Oct 10;19(20):4383. doi: 10.3390/s19204383

Table 9.

Positive and negative rates results of the 10 fold cross validation.

Normal Flooding Scheduling Grayhole Blackhole
TPR 1 0.98 0.93 0.99 0.99
TNR 0.98 1 1 1 1
FPR 0.02 0 0 0 0
FNR 0 0.02 0.07 0.01 0.01
Overall Accuracy 0.997