Skip to main content
. 2019 Oct 25;19(21):4637. doi: 10.3390/s19214637

Table 6.

RH calibration procedure.

w/b Fitting Formula (Ascending Stage) Fitting Formula (Descending Stage) Critical Point (Ratio to RH 98%) Correction Factor (Descending Stage) Correction Factor (Descending Stage)
0.30 yA = –1.671x + 1162.286 (R2 = 0.999) yD = 0.401x + 958.067 (R2 = 0.996) 98% (1) 1 (standard) 1 (standard)
0.28 yA = –1.078x + 1106.278 (R2 = 0.985) yD = 0.463x + 960.697 (R2 = 0.994) 96% (0.98) 1.55 1.15
0.26 yA = –0.768x + 1007.194 (R2 = 0.976) yD = 0.544x + 956.493 (R2 = 0.993) 94% (0.96) 2.17 1.36
0.24 yA = –0.740x + 1076.206(R2 = 0.980) yD = 0.580x + 961.198 (R2 = 0.998) 90% (0.92) 2.26 1.45