Skip to main content
. 2019 Nov 1;19(21):4752. doi: 10.3390/s19214752

Table 5.

Comparison of computation cost and running time.

Computation Cost Yang et al. [23] Tan et al. [30] Cai et al. [21] Cho et al. [31] Gope and Hwang [3] Proposed Scheme
CCtag 2Th 2Th 4Th 3Th 5Th 2Th
CCRi 3Th 2Th 2Th 2Th 2Th 2Th
CCS 5Th 3Th 6Th 5Th 7Th 4Th+2Tse
CCTotal 10Th 7Th 12Th 10Th 14Th 8Th+2Tse
CCTime 0.023 ms 0.0161 ms 0.0276 ms 0.023 ms 0.0322 ms 0.0276 ms