Table 3.
E1 (%) | E2 (%) | E3 (%) | E4 (%) | E5 (%) | E6 (%) |
---|---|---|---|---|---|
#47/100 | #56/100 | #41/100 | #21/100 | #30/100 | #63/100 |
#72/21.2 | #42/40.2 | #78/47.2 | #98/46.1 | #29/6.4 | #3/45.1 |
#68/4.2 | #98/20.4 | #44/23.7 | #42/22.5 | #33/5.1 | #62/39.5 |
#16/4.1 | #95/15.8 | #93/18.9 | #13/13.1 | #16/4.7 | #16/35.8 |
#10/2.6 | #13/15.6 | #20/11.9 | #95/9.80 | #99/4.5 | #85/21.3 |
#95/2.3 | #59/14.9 | #85/2.5 | #60/8.90 | #15/3.9 | #96/14.4 |
Top six components are shown. For each component, the component index (#) and its probability (%) are listed. The top component is the task‐related component. Concurrent components in E2 and E4 are highlighted by bold.