Skip to main content
. 2019 Jul 5;8(11):805–814. doi: 10.1002/psp4.12444

Table 2.

Regression of prediction‐corrected exposure metric and PT covariate exposure (intercept and slope)

Exposure measure Estimate Lower CI Upper CI P value
AUC0–24, μg*L/hour Intercept –0.0147 –0.117 0.088 0.778
Slope 1.02 0.924 1.120 <0.001
Cmax, μg/L Intercept 0.34 0.272 0.408 <0.001
Slope 0.659 0.594 0.725 <0.001
Ctrough, μg/L Intercept –1.14 –1.41 –0.868 <0.001
Slope 2.27 2.01 2.530 <0.001

AUC0–24, area under the plasma concentration–time curve from 0 to 24 hours; CI, 95% confidence interval; Cmax, maximum concentration; Ctrough, trough concentration at the end of the dosing interval before the next dose; PT, prothrombin time.