Skip to main content
. 2019 Nov 7;12(22):3664. doi: 10.3390/ma12223664

Table 3.

Experimental plan. W/B, water/binder.

Evaluation Items Experimental Variables
Factors of mixture Types of liquid chemical SS (No. 3)
Types of liquid B binders OPC, CGM
W/B ratio of liquid B 140%
Volume replacement ratio of liquid B 50%
Test items Effects of CGM on shortening gel time Gel state Gel time (s)
Constructability Average daily workload (m/day)
Construction speed Construction period per 1 m (min/m)
Effects of CGM on increasing on homogel strength Hardened state Homogel strength (MPa)
Durability Chemical shrinkage (%)
Air permeability (×10−10 m2)
X-ray diffraction analysis
Scanning electron microscope analysis
Leakage length Leakage length per 1 m2 (m/m2)