Skip to main content
. 2019 Nov 2;11(11):1709. doi: 10.3390/cancers11111709

Table 2.

Temperature increase at 600 sec for centric heating target measured with thermistor probes and computed Magnetic Resonance Thermometry (MRT).

Institution Temperature Measurement Mean Temperature Increase [ΔT (°C)] at Locations 1 to 4 Mean Temperature Increase± SD (°C)
ΔT Location 1 ΔT Location 2 ΔT Location 3 ΔT Location 4
1 Thermistor probe 4.7 4.6 5.2 5.3 5.0 ± 0.3
MRT 3.8 3.5 4.3 4.3 4.0 ± 0.3
2 Thermistor probe 6.8 4.7 5.6 5.6 5.7 ± 0.7
MRT 6.2 4.9 5.3 5.1 5.4 ± 0.5
3 Thermistor probe 4.4 4.2 4.4 4.3 4.3 ± 0.1
MRT 3.6 3.2 3.7 3.5 3.5 ± 0.2
4 Thermistor probe 4.1 4.1 3.9 4.0 4.0 ± 0.1
MRT 3.2 3.9 3.5 3.3 3.5 ± 0.3
5 Thermistor probe 3.2 3.4 4.0 4.2 3.7 ± 0.4
MRT 2.3 2.4 3.0 3.3 2.7 ± 0.4