Skip to main content
. 2019 Sep 14;7(17):2908–2916. doi: 10.3889/oamjms.2019.789

Table 3.

Budget/Funding

S.No Budget Items Numbers Cost per Item (In SAR) Total Cost (In SAR)
1 Man power 2 1000 2000
2 Instruments (Print out of Questionnaires) 4X 500 = 2000 1 2000
3 Equipment’s (Laptop) 1 1500 1500
4 Consumables (Papers, pens, stapler, pins, writing pads etc) 500 500
5 SPSS Software original version 1 2000 2000
Total Cost 8000