Skip to main content
. 2019 Nov 17;11(11):616. doi: 10.3390/pharmaceutics11110616

Table 1.

Overview of process parameters of the different freeze-drying cycles employed. All cycles had a loading step of 60 min at 5 °C prior to freezing. End of primary drying time was determined as ∆pc ≤ 1 mTorr between Pirani and capacitance probe.

Cycle Freezing Primary Drying Secondary Drying
Ramp (°C/min) Ts (°C) pc (mTorr) Ramp (°C/min) Ts (°C) Hold Time (min) Pressure (mTorr)
0 Ramp 0.3 °C/min Temp. −35 °C Hold 180 min 0.2 −10 100 0.2 +25 360 100
1 0.2 +10 100 0.2 +25 360 100
2 0.2 +30 100 0.2 +40 360 100
3 1.0 +30 100 0.2 +40 360 100
4 0.2 +30 155 0.2 +40 360 155
5 0.2 +30 100 -

Ts: shelf temperature, pc: chamber pressure.