Skip to main content
. 2020 Feb 7;486:110076. doi: 10.1016/j.jtbi.2019.110076

Fig. 3.

Fig. 3

Numerically-obtained values using integral in Eq. (21) to compute the length of time it takes for the transmission dynamics to reach the value of M=M(z,k) for two different initial values of M=M(t0), as shown in the legend. A range of worm death rates have been used of μ1=1/2years1,1/5years1,1/8years1,1/12years1 in decreasing order, which corresponds to a fading colour in the plotted lines.