Skip to main content
. 2020 Jan 31;10:1554. doi: 10.1038/s41598-020-58028-0

Figure 3.

Figure 3

Final positions of particles released in each simulation run (duration: 28 days) for Scenario 2 by year. Colors of points corresponds to the selected 4 different releasing dates (June 1st, June 21st, July 11th, July 31st) within each year, whereas yellow lines represent the (fixed) positions of releasing starting points, placed on the main spawning grounds as detected by Basilone et al. (2013).