Skip to main content
. 2020 Feb 21;17(4):1410. doi: 10.3390/ijerph17041410

Table 5.

Results of performance evaluation of 14 LCPs in Jianghan Plain of Hubei province.

Project Number Correlation Degree Performance Level
K1(Mx) K2(Mx) K3(Mx) K4(Mx)
LCP1-GLM −0.03019 −0.01010 0.00558 −0.02378 General
LCP2-GLM −0.03952 −0.02237 −0.00921 0.00076 Poor
LCP3-CLM 0.00322 −0.01923 −0.07266 −0.14262 Excellent
LCP4-GLM −0.03667 −0.01959 −0.00425 −0.00241 Poor
LCP5-CLM −0.02333 −0.00681 −0.01027 −0.05355 Good
LCP6-CLM −0.02665 −0.03900 −0.07904 −0.10967 Excellent
LCP7-CLM −0.02247 −0.00530 −0.00627 −0.04078 Good
LCP8-CLM −0.01415 −0.01872 −0.03681 −0.06815 Excellent
LCP9-GLM −0.03160 −0.01412 0.00572 −0.01750 General
LCP10-GLM −0.03777 −0.02553 −0.01114 −0.00184 Poor
LCP11-GLM −0.04047 −0.01930 −0.00865 −0.00725 Poor
LCP12-GLM −0.02143 −0.00416 −0.01447 −0.05922 Good
LCP13-CLM −0.02207 −0.01219 −0.02529 −0.04369 Good
LCP14-CLM −0.03699 −0.02169 −0.00559 −0.00769 General