Skip to main content
. 2020 Mar 12;21:68. doi: 10.1186/s12931-020-1326-1

Table 5.

Required number of primary endpoint events

HR = 0.50 HR = 0.55 HR = 0.60 HR = 0.65 HR = 0.70 HR = 0.75
80% power 65 88 120 169 247 379
85% power 75 100 138 194 282 434
90% power 87 118 161 226 330 508

Calculations performed using nQuery 7.0 and assume a 0.05 type I error rate (two-sided) with 1:1 randomization