Skip to main content
. 2020 Mar 4;2020:2934296. doi: 10.1155/2020/2934296

Table 2.

Waste treatment facilities at the 5 hospitals.

Facility Type of incinerator/facility Auxiliary fuel type Waste incinerated kg/cycle Air pollution control Incineration cycle time
KBTH Incinco Diesel 10–50 In-built filter 5-6 hours
KATH Incinco Diesel 5–10 In-built filter 2–5 hours
MP 400 LPG 30–50 No ½–1 hour
CCTH Autoclave Steam
BRH Incinco Diesel No
UCCH Locally made LP gas No 5 hours