Skip to main content
. Author manuscript; available in PMC: 2020 Dec 21.
Published in final edited form as: J Cogn Neurosci. 2019 Jul 5;31(11):1617–1630. doi: 10.1162/jocn_a_01440

Table 1. Planning Phase RTs and Execution Phase Accuracies in Each Condition.

Baseline Simple Maze Simple Arrow Complex Time Pressure Reward
RT (sec) 1.11 ± 0.06 1.56 ± 0.08 1.53 ± 0.07 3.16 ± 0.20 1.58 ± 0.09 1.60 ± 0.09
Accuracy (% correct) 97.1 ± 0.75 96.6 ± 1.12 91.1 ± 1.68 91.9 ± 2.00 88.02 ± 2.41

Values are means ± standard errors.