Table 5.

Results of sensitivity analysis.

Parameter(s) Unit Minimum Base case Maximum Interval Number Influential coefficient Ranking
Building Load
Annual mean dry bulb temperaturea °C 22.066 23.066 24.066 0.1 21 1.080 1
Annual mean dew point temperaturea °C 17.907 18.907 19.907 0.1 21 0.460 4
Annual mean global solar radiationa W h/m2 192.907 292.907 392.907 10 21 0.124 11
Occupant density (office) m2/person 5 8 20 1 15 −0.104 14
Occupant density (SA) Person/floor 35 42 45 1 10 0.0428 17
Lighting load (office) W/m2 10 20 30 1 20 0.113 13
Lighting load (SA) W/m2 10 20 30 1 20 0.0646 15
Equipment load (office) W/m2 10 25 40 1 30 0.148 9
Equipment load (SA) W/m2 10 12 40 1 30 0.0310 18
AC operating hours (office)b h 17:00 19:00 22:00 0.25 20 0.627 3
AC operating hours (SA) c h 24 24 24
Annual mean occupancy rate (office)d % (floor) 50% (31) 73.4% (47) 100% (62) 1 31 0.239 6
Annual mean occupancy rate (SA)d % (floor) 50% (14) 73.4% (21) 100% (28) 1 14 0.215 7
Ventilation rate (office) m3/s/person 0.005 0.01 0.015 0.002 6 0.0243 19
Ventilation rate (SA) m3/s/person 0.005 0.01 0.015 0.002 6 0.0199 20
Infiltration rate (office) ACH 0.05 0.1 0.25 0.02 11 −0.00113 22
Infiltration rate (SA) ACH 0.05 0.1 0.25 0.02 11 0.00470 21
System control and operation
Supply air temperature (office) °C 10 14 18 0.1 80 −0.116 12
Supply air temperature (SA) °C 10 14 18 0.1 80 −0.151 8
Thermostat set point (office) °C 20 24 28 0.1 80 −0.290 5
Thermostat set point (SA) °C 20 24 28 0.1 80 −0.131 10
HVAC plant
Chilled water supply (CHWS) temperature °C 4 6.7 9 0.1 50 −0.0614 16
Overall COP of chiller plant 3 4.1365 5 0.1 21 −0.864 2
a

This SA study focused on the importance of parameters affecting the energy use of a chiller plant. The seasonal variation in these weather variables, therefore, was not included. The annual mean temperature was taken as the average value of the daily mean air temperature throughout a year.

b

AC operating hours (office) involves two parameters, the AC start-up time and operating duration, would be adjusted. In this study, the AC start-up time, which is 8:00 am, remained unchanged and only the operating duration was changed.

c

AC operating hours (SA) was assumed to be unchanged as it is very unlikely for SA operators to reduce the operating hours.

d

The data on occupancy rate is in terms of the annual mean percentage. The occupancy rate was converted into the number of floors being fully occupied. Besides, it was assumed that a tenant rents the office floor in terms of a whole floor, instead of half-floor. Similarly, the SA operator will try to occupy the whole floor for minimising the operation costs.