Table 2.
Airflow exchange rate calculations by vault
| Machine vault | Measurement∗ | Airflow exchange per hour | t99% (min) | t99.9% (min) |
|---|---|---|---|---|
| Primary campus | ||||
| Standard LINAC 1 | Actual | 10.07 | 27.72 | 41.14 |
| Standard LINAC 2 | Actual | 5.94 | 46.53 | 69.97 |
| Standard LINAC 3 | Actual | 5.83 | 47.39 | 71.30 |
| Tomotherapy | Actual | 16.99 | 16.60 | 24.31 |
| Specialty stereotactic | Actual | 7.63 | 36.40 | 54.39 |
| Regional campus 1 | ||||
| All standard LINACs | Minimum | 12 | 23.34 | 34.49 |
| Maximum | 18 | 15.68 | 22.94 | |
| Tomotherapy | Minimum | 10 | 27.91 | 41.43 |
| Maximum | 15 | 18.75 | 27.55 | |
| All proton gantries | Minimum | 6 | 46.07 | 69.26 |
| Maximum | 12 | 23.34 | 34.49 | |
| Regional campus 2 | ||||
| Standard LINAC | Actual | 6.5 | 42.59 | 63.91 |
| Regional campus 3 | ||||
| Standard LINAC | Actual | 8 | 34.74 | 51.86 |
| Regional campus 4 | ||||
| Standard LINAC | Actual | 6.5 | 42.59 | 63.91 |
Abbreviations: LINAC = linear accelerator; t99% = time for 99% airflow exchange; t99.9% = time for full (99.9%) airflow exchange.
Actual measurements represent airflow measured under standard automatic temperature control and building automation systems settings. Minimum and maximum measurements represent the range of airflow rates delineated according room design specifications; these were not directly measured.