Skip to main content
. 2015 May 17;79:178–200. doi: 10.1016/j.tre.2015.04.007

Table C.8.

Optimal solutions of three models in Situation 4.

j = 1 j = 2 j = 3 j = 4 j = 5 j = 6
Basic model i = 1 m1:25,000
i = 2 m2:65,951 m2:10,509 m2:23,540 m4:27.20 m4:5.05
m4:31.55 m4:11.20
i = 3 m1:29,734 m1:43,667 m1:34,269 m4:11.00 m1:22,330 m2:64,329
m3:89.59 m2:55,272 m4:13.65
m5:270.0 m3:15.00
i = 4 m1:19,741 m2:2000 m1:19,810 m1:20,449
m3:40.00
m5:60.00



Extended Model 1 i = 1 m1:25,000
i = 2 m2:65,960 m4:1.320 m4:11.92 m4:27.20 m2:34,040
m4:29.16 m4:5.400
i = 3 m1:74,480 m1:18,671 m1:34,245 m1:2604 m2:28,374
m3:136.7 m2:67,706 m2:23,489
m5:270.0 m4:10.44 m4:14.56
i = 4 m3:24.00 m3:16.00 m1:19,790 m1:19,724 m1:20,486
m5:60.00 m2:2000



Extended Model 2 i = 1 m1:2522 m5:11.00 m3:16.00 m1:23,328
m3:34.00 m5:21.67
m5:67.33
i = 2 m2:65,153 m2:10,551 m2:23,489 m2:1807 m4:27.20
m4:16.80 m4:18.00 m4:13.00
i = 3 m1:71,958 m1:23,797 m1:34,245 m2:62,414
m3:150.0 m2:57,141 m4:16.00 m4:6.000
m5:270.0 m4:3.000
i = 4 m3:5.000 m1:19,874 m1:19,790 m1:20,336
m3:16.00 m3:13.00 m2:2000
m5:44.00 m3:6.000
m5:16.00