Skip to main content
. 2019 Jun 26;40(20):2706–2717. doi: 10.1002/elps.201900167

Table 5.

Predicted LAMP structure size versus real LAMP structure size for loop primer mix testing. n = 4

Structure Predicted Size (bp) Average Structure Size (bp) Difference (bp)
Stem and Loop, x = 1 168 169 1
Stem and Loop ×2, x = 2 265 261 4
Stem and Loop ×3, x = 3 367 355 12
Stem and Loop ×4, x = 4 464 466 2
Stem and Loop ×5, x = 5 566 577 11
Stem and Loop ×6, x = 6 663 668 5
Stem and Loop ×7, x = 7 765 749 16

This article is being made freely available through PubMed Central as part of the COVID-19 public health emergency response. It can be used for unrestricted research re-use and analysis in any form or by any means with acknowledgement of the original source, for the duration of the public health emergency.