Table 6. Required flow rates from input ditches to the Hanalei River to achieve river loadings of FIB observed in the field.
2008 | 2009 | |||
---|---|---|---|---|
River Segment [m] | EC | ENT | EC | ENT |
4900 | 2.98(107%) | * | 2.46 (48.9%) | * |
5425 | * | * | * | 4.25 (84.6%) |
7600 | 0.01 (0.3%) | 0.15 (5.3%) | 0.03 (0.5%) | * |
* Loads not different from 0 in Fig 5 were not evaluated.