Table 7. Required groundwater fluxes of FIB to achieve river loadings of FIB observed in the field.
2008 | 2009 | |||
---|---|---|---|---|
River Segment [m] | EC | ENT | EC | ENT |
2400 | * | 770 | * | * |
3100 | 8.6 × 103 | 3.6 × 103 | 5.1 × 103 | 4.5× 103 |
4900 | 7.7 × 103 | * | 6.4 × 103 | * |
5425 | * | * | * | 1.1 × 104 |
7600 | 3.1 × 103 | 6.9 × 103 | 9.0 × 103 | * |
8240 | 8.6 × 103 | * | * | * |
* Loads within river segments not different from 0 or negative in Fig 5 were not evaluated.