Table 1.
the new feed-in tariff to support renewable and clean energy resources in Iran.
Energy type | Specification | IRR/kWh (USD/kWh) |
|
---|---|---|---|
The first decade | The second decade | ||
Biomass | Landfill | 2700 (6.43) | 1890 (4.5) |
Anaerobic digestion of livestock and agriculture wastes and sewage sludge | 3500 (8.33) | 2450 (5.83) | |
Waste Incineration and gasification | 3700 (8.81) | 2590 (6.17) | |
Wind | More than 50 MWa | 3400 (8.10) | × (0.4–1)b |
≤50 MW | 4200 (10) | × (0.4–1)b | |
≤1 MW | 5700 (13.57) | × (0.4–1)b | |
Solar | More than 30 MWa | 3200 (7.62) | 2240 (5.33) |
≤30 MW | 4000 (9.52) | 2800 (6.67) | |
≤10 MW | 4900 (11.67) | 3430 (8.17) | |
≤100 kW | 7000 (16.67) | 4900 (11.67) | |
≤20 kW | 8000 (19.05) | 5600 (13.33) | |
Small hydropower (≤10 MW) | On the rivers and peripheral equipment for dams | 2100 (5) | 1470 (3.5) |
On the water pipeline transport | 1500 (3.57) | 1050 (2.5) | |
Geothermal | including drilling and equipment | 4900 (11.67) | 3430 (8.17) |
WHRU | Production of electricity from the waste heat recovery unit | 2900 (6.90) | 2030 (4.83) |
Fuel cells | – | 4948 (11.78) | 3463.6 (8.25) |
Turboexpander | Known as turbo-expander or expansion turbine | 1600 (3.81) | 1120 (2.67) |
The highest level capacity for the wind and solar farms will be determined by the policy of the ministry of energy on renewable and clean energy development policy, which is following up to 2000 MW in a year by the private sector.
During the second decade, the contract fee will calculate based on the capacity factor. For wind farm with capacity factors ≥40% and ≤20% during the first 10 years, the prime fee will multiply in 0.4 and 1, respectively. For capacity factors between 20 and 40%, the prime fee will multiply in a number proportionally.