Skip to main content
. 2020 May 26;94:34–42. doi: 10.1016/j.tranpol.2020.05.012

Table 2.

The results of the gravity model with PPML estimation.

Variable (1) CASE215 (2) CASE215 (3) CASE215 (4) CASE215 (5) CASE201
lnGDP 0.1691 (0.1101) 0.1364 (0.1164) 0.1801 (0.1127) 0.1422 (0.1177) 0.2923b (0.1141)
AIR 0.0090c (0.0023) 0.0101c (0.0024) 0.0090c (0.0023) 0.0101c (0.0024) 0.0092c (0.0023)
HST 0.0006a (0.0003) 0.0005a (0.0003) 0.0006a (0.0003) 0.0005a (0.0003) 0.0004 (0.0003)
COACH 0.0002 (0.0003) 0.0002 (0.0002) 0.0002 (0.0003) 0.0002 (0.0002) 0.0000 (0.0003)
lnLAT 0.3456 (0.4476) 0.0442 (0.4464) 0.2931 (0.4637) 0.0062 (0.4603) −0.2449 (0.3852)
lnLONG −0.7624 (1.8825) −1.2816 (2.2591) −0.6953 (1.9158) −1.2156 (2.2851) −1.7785 (2.0926)
lnDIST −1.3942c (0.2473) −1.4056c (0.2471) −1.4732c (0.2692)
lnTIME −1.6229c (0.2704) −1.6677c (0.2701)
HUB −0.2924 (0.4712) −0.1824 (0.4076) −0.2583 (0.5006)
R-squared 0.74 0.73 0.74 0.74 0.61
Obs. 360 360 360 360 360
a

Significant at 10%.

b

Significant at 5%.

c

Significant at 1%.