Skip to main content
. 2020 Apr 29;20(9):2526. doi: 10.3390/s20092526

Table 2.

Irrigation scheduling carried out in the different zones.

Year T1 T2 CR1 CR2 CR3 CR4
2015 Farmer Farmer Farmer Farmer Farmer
2016 NAIS NAIS AIS AIS AIS
2017 NAIS NAIS AIS AIS AIS AIS

NAIS = non-automatic irrigation scheduling; AIS = automatic irrigation scheduling.