Skip to main content
. 2020 Mar 6;54(7):4180–4189. doi: 10.1021/acs.est.9b07527

Figure 4.

Figure 4

Thickness of the deposits on the flume-tank floor. A vertical section of the deposits was sampled 2.8 m downstream of the inlet box (i.e., 0.2 m in front of the siphon tubes).