Ordinal Number Height from the Bottom of the Floor (cm) Ultrasound Netto Passing Time in Direction I-I tn I-I (µs) Ultrasound Netto Passing Time in Direction II-II tn II-II (µs) Mean Ultrasound Netto Passing Time tn (µs) Ultrasound Wave Velocity CL (km/s) Concrete Compression Strength fc (MPa)
1 14.5 34.2 34.6 34.40 2.733 9.35
2 14.0 34.4 34.4 34.40 2.733 9.35
3 13.0 34.0 35.8 34.90 2.693 8.78
4 12.0 29.7 30.7 30.20 3.113 16.38
5 11.0 28.2 28.2 28.20 3.333 22.00
6 10.0 26.9 28.5 27.70 3.394 23.77
7 9.0 29.2 27.0 28.10 3.345 22.34
8 8.0 28.6 26.7 27.65 3.400 23.95
9 7.0 27.2 26.6 26.90 3.494 26.97
10 6.0 26.9 27.2 27.05 3.475 26.33
11 5.0 27.5 27.2 27.35 3.437 25.11
12 4.0 27.8 26.1 26.95 3.488 26.75
13 3.0 25.9 26.5 26.20 3.588 30.21
14 2.0 26.4 26.9 26.65 3.527 28.07
15 1.0 25.8 26.3 26.05 3.608 30.97
16 0.5 25.7 26.6 26.15 3.595 30.46