. 2020 May 19;31:105688. doi: 10.1016/j.dib.2020.105688
Degree of Importance
Notes
ID Parameters categories Parameters 1 2 3 4 5
P1 Civil Area served (hectare)
P2 Civil Total length of PVC pipe line
P3 Civil Construction year
P4 Civil Mesqa discharge (capacity)
P5 Mechanical Number of Irrigation Valves (alfa-alfa valve)
P6 Civil Consultant performance and errors in design
P7 Electrical Number of electrical pumps
P8 Civil PVC pipe diameter
P9 Location Orientation of mesqa (intersecting with drains or roads or both)
P10 Mechanical Electrical and diesel pumps discharge
P11 Civil PC Intake, steel gate and Pitching with cement mortar
P12 Location Type of mesqa (Parallel to branch canal (Gannabya), Perpendicular on branch canal)
P13 miscellaneous Farmers Objections
P14 Electrical Electrical consumption board type
P15 Location Geographical zone
P16 Civil Pump house size 3m*3m or 3m*4m
P17 miscellaneous cement price
P18 Mechanical Head of electrical and diesel pumps
P19 miscellaneous Farmers adjustments
P20 Civil Sand filling
P21 Civil Sump size
P22 Civil Contractor performance and bad construction works
P23 miscellaneous pump price
P24 Civil Crops on submerged soils (Rice) and its season (May to July)
P25 miscellaneous pipe price
P26 Location Topography and land levels of command area
P27 Civil Construction planned durations
P28 Civil Pumping and suction pipes
P29 Mechanical Steel mechanical connections
P30 Civil Difference between land and water levels
P31 miscellaneous steel price
P32 Civil Number of PVC branches
P33 miscellaneous Cash for damaged crops
P34 Mechanical Air / Pressure relief valve
P35 miscellaneous Crops on unsubmerged soils (wheat, corn, cotton, etc.)
C Output Cost of FCIP
D Output Duration of FCIP construction