Table 3.
The parameter values and initial condition of simulations for Toronto.
Parameter | Mean value | Std | CI | References |
---|---|---|---|---|
(Phase 1) | MCMC | |||
(Phase 2) | MCMC | |||
(Phase 1) | 0.1421 | 0.0734 | [0, 0.2858] | MCMC |
(Phase 2) | 0.1140 | 0.0709 | [0, 0.2530] | MCMC |
5928000 | – | – | [30] | |
5927990 | – | – | Calculated | |
4.12 | 4.83 | [0, 13.58] | MCMC | |
2.43 | 2.22 | [0, 6.78] | MCMC | |
3.22 | 2.89 | [0, 8.88] | MCMC | |
1 | – | – | [26] | |
0 | – | – | Estimated | |
0 | – | – | Estimated |
Phase 1 is from Jan 26 to Mar 18, and Phase 2 is from Mar 18 to Mar 29.