Skip to main content
. 2020 Jun 1;326:108391. doi: 10.1016/j.mbs.2020.108391

Table 6.

The parameter values and initial condition of simulations for Italy.

Parameter Mean value Standard derivation 95% CI References
β (Phase 1) 0.0179 1.19×103 [0.0156, 0.0203]] MCMC
β (Phase 2) 4.45×104 2.30×104 [0,8.95×104] MCMC
ξ (Phase 1) 0.0996 0.0458 [9.87×103,0.1894] MCMC
ξ (Phase 2) 0.1312 0.0250 [0.0823, 0.1801] MCMC
kNk(0) 59430000 [31]
kSk(0) 59429892 Calculated
kEk(0) 69.01 56.92 [0, 180.58] MCMC
kAk(0) 22.60 18.24 [0, 58.35] MCMC
kIk(0) 32.11 24.23 [0, 79.59] MCMC
kHk(0) 2 [26]
kRk(0) 0 Estimated
kDk(0) 0 Estimated

Phase 1 is between Jan 31 and Mar 8, and Phase 2 is between Mar 8 and Mar 26.