MDP of self-adaptive process monitoring system

State Inline graphic Inline graphic: relative prefix-length (smaller values mean earlier in the process)
Inline graphic: predicted numeric process outcome
Inline graphic: prediction reliability
Action Inline graphic Inline graphic: 1 = trigger alarm; 0 = do not trigger alarm
Reward Inline graphic Inline graphic: Penalization of late predictions
Inline graphic:

Process execution costs

Inline graphic if false negative prediction (contractual penalty)

Inline graphic if true positive prediction (adapt. costs)