Skip to main content
. 2020 Jun 21;10(6):e034552. doi: 10.1136/bmjopen-2019-034552

Figure 2.

Figure 2

Path diagram for confirmatory factor analysis, displaying the four-factor model, with standardised parameter estimates. Deleted items: 5, 6 and 8 (total items=18/21).