Skip to main content
. 2019 Jun 25;47(3):1439–1475. doi: 10.1007/s11116-019-10022-w

Table 7.

Linear models for adjustment of activity assignments; the parameters indicate how 1 h less of work is replaced by additional time spent on other activities (and vice versa) to meet the time constraint; left side: adjustment model for the increase in working time (if reported working time was lower than effective working time); right side: adjustment model for reduction of working time (if reported working time was higher than effective working time)

Activity Increase of working time Reduction of working time
Parameter t-value p value Parameter t-value p value
Travel 0.166 3.586 0.000 0.000
Sleep 0.083 1.393 0.164 0.019 0.172 0.863
Eating 0.143 3.274 0.001 0.053 0.731 0.465
Education 0.076 1.664 0.097 0.075 1.190 0.235
Personal 0.239 3.383 0.001 0.000
Domestic 0.000 0.430 2.056 0.041
Shopping 0.008 0.461 0.645 0.017 0.497 0.619
Leisure 0.285 2.483 0.013 0.406 1.944 0.053