Skip to main content
. 2020 Jun 26;56:227–240. doi: 10.1016/j.jmsy.2020.05.015
St = (0.000050, 0.000060, 0.000065) year/setup Cr = (6, 8, 10) $/unit
D = (350000, 400000, 550000   units/year L = (5, 15, 20) $/unit
P = (400000, 500000, 600000) units/year B = (5, 10, 12) $/unit
Td = (0.0025, 0.0030, 0.0035) year S = 250000 meter sq.
s = (1.1, 2.2, 3.3) m.sq./unit a = 1000
CI = (0.2, 0.4, 0.6) $/unit m = 2.5
q = (750, 800, 950) units c = 0.75
Cp = (30, 40, 50) $/unit r = 0.95
A = (40, 50, 60) $/setup b = 0.5
H = (0.8, 1, 1.2) $/unit N = 3
W = $6500000 M = 5