St = (0.000050, 0.000060, 0.000065) year/setup | Cr = (6, 8, 10) $/unit |
D = (350000, 400000, 550000 units/year | L = (5, 15, 20) $/unit |
P = (400000, 500000, 600000) units/year | B = (5, 10, 12) $/unit |
Td = (0.0025, 0.0030, 0.0035) year | S = 250000 meter sq. |
s = (1.1, 2.2, 3.3) m.sq./unit | a = 1000 |
CI = (0.2, 0.4, 0.6) $/unit | m = 2.5 |
q = (750, 800, 950) units | c = 0.75 |
Cp = (30, 40, 50) $/unit | r = 0.95 |
A = (40, 50, 60) $/setup | b = 0.5 |
H = (0.8, 1, 1.2) $/unit | N = 3 |
W = $6500000 | M = 5 |