Skip to main content
. 2020 May 30;13(11):2496. doi: 10.3390/ma13112496

Table 17.

DOE setup for UTS as a function of build orientations.

Front Side Top
53.75 52.94 51.05
49.09 51.98 52.10
50.37 50.91 50.60
52.26 51.51 50.32
51.77 51.73 52.26
52.78 51.87 50.91
52.50 53.75 50.91
53.92 52.26 50.91
53.50 52.26 52.86
52.86 52.26 52.94
53.75 49.09 51.98
53.75 50.37 52.50